/images/logo.gif
 

Chinese

 
Search:
 Home | About Us | Strategy | Our Culture | News | Our Products | Subsidiaries | Contact Us 
  Home > Content
Tian Chen Fuyuan 2 × 350,000 kilowatts of thermal power project started construction
December 26, 2017  

 

The groundbreaking ceremony.

 

Zaozhuang, December 26 -Tianchen Fuyuan 2×350,000 kilowatts thermal power project held a grand start at the project site, which means the construction will start soon. The Coal Cogeneration development base at the southern part of Shandong Province had thus entered acceleration stage. 

 

Tianchen Fuyuan 2×350,000 kilowatts CHP project is the focus project of "13th Five-Year Plan" in Shandong Province. It is one of the key construction projects of Shandong Energy Group to build "Zaozhuang coal-based comprehensive utilization base" in order to speed up the development of recycling economy. It is also the single largest investment Zaozhuang Mining Group had ever made since its existence.

 

The total investment of the project accounts for 3.163 billion yuan, covering a planning area of 28.87 hectares. The installation program includes 2× 1160t/h supercritical circulating fluidized bed boiler plus 2×350MW extraction condensing steam turbine generator set. The construction period is expected to be 24 months. After the project is completed and put into operation, the annual power generation capacity will reach 3.5 billion kWh and the annual heat supply will be 6.35 million GJ.

 

 

 

 

Close Window
Copyright © 2012 ShanDong Energy Group CO.,LTD. All Rights