英文站

News

current location: Home News Content

Shandong Energy Group obtained 400MW wind power construction quota in Inner Mongolia


Alashan League, September 16 - During September 6 and 12, administrative bureau of Alashan League, Inner Mongolia autonomous region, publicized the result of competition to construct the 1600 MW wind farm at the renewable energy base of Alashan League, which would supply the UHV dc transmission channel that leads into Shandong province. Shandong Energy Group scored top grades among all competitors and won 400 MW of construction quota. This is the breakthrough for Shandong Energy Group in the field of onshore wind power construction.

The project has a planned installed capacity of 400MW which requires a total investment of about 2.5 billion yuan. After construction, the project is expected to generate about 1 billion kilowatt hours of electricity annually.